PPT Slide
- A light/heavy single service warfighting structure of:
(9) separate Army Cmds, regional army HQTRs,
controlling (90) maneuver + (60) artillery/rocket BNs.
- All units, and headquarters are in constant turbulence because of the in- and out-flow of soldiers. Tiered readiness is misleading: 90 percent -- while the unit turnover rate varies from 33-50 percent (100 percent for Korea) a year. Readiness is illusory!
- Headquarters in current Cold War Division-based Structure are reorganized to provide Joint Operational C2 in unified commands.
- Re-Organization creates cohesive, Joint, ready, agile combat power for the CINCs: (26) Close Combat Groups, (22) Deep Combat Groups, (20) Rear Combat Groups in (3) Expeditionary Corps on rotational readiness.
- $ Saved from reduction in HQ, log tail, overseas presence, unneeded equipment and rotational readiness can be rolled into modernization!
You Decide! An Industrial Age Army or An Information Age Army?
INDUSTRIAL AGE OR INFORMATION AGE