PPT Slide
3. 30 DOS for the early deploying force of an Army Corps-based JTF (Support for the C+38 force). (3xLASH and 2xContainer ships
4. Port opening UE sets, OOTW UE sets, and watercraft. (HLPS and T-ACS)
2. Theater opening CS/CSS UE sets. (400K sq ft increase to 800,000 sq ft/ Equipment for 1 JTF SPT GRP)
1. (2) Combat Maneuver Group unit equipment (UE) sets w/ 15 days of supply (DOS) (1.2 Million sq ft).
Possible Reconfiguration of APA to Rapidly Deploy (2) CMGs + (1) JTF SPT Group. With (3) sets afloat in the Pacific, Mediterranean and Indian Oceans, an Army Expeditionary Force could be on the ground in a few days.